+971 52 2477942Mon–Fri 09:00–18:00 GST
IH
Indus Hydraulics
Industrial Components Co.
SERVICES · WORKSHOPS · ON-SITE

Things people bring us broken, and what we sent back.

Service jobs run out of our Jebel Ali yard — written as case studies, with photos, measurements and what it actually cost. Browse the cases or jump straight to a quote.

2,400+
Jobs / yr
96h
Avg TAT
100%
On-time
CT/SNUB/WL BOP2-6 WEEK CYCLE
NO. 15CT/SNUB/WL BOP

Intervention BOPs are not drilling BOPs — and the workshop discipline is not the same.

Indus runs a dedicated intervention-BOP line — CT Quads, snubbing stacks with stripper rams, wireline grease BOPs — separate from the drilling bays. Sour-service rebuild, API 16A 5-year recert, hydrotest at 1.5× WP, function test per cavity. 2-6 week cycle TAT for Halliburton, SLB, Expro, Cansco, Axis and Cudd intervention crews.

CT Quad · Snub · WirelineHydrotest 1.5× WP · 30 minAPI 16A recert · 5 yrNACE MR0175 sour service
CT & WIRELINE5 D EMERGENCY
NO. 05CT & WIRELINE

A CT injector skid pulled mid-job from a sour Aramco well — back on location in five days, not seven.

A CT injector skid was pulled mid-job from a sour Aramco well with chain-block slip and a dead accumulator. We stripped, re-faced, re-bladdered, re-tuned and function-tested it in 5 days — back on location for the same-week return slot.

5-day turnaround · slot heldOEM commissioning · 24/24Same-week return
HOW WE WORK · A LOOK INSIDE

The same four steps run every service, every time — from a piston seal to a BOP recert.

STEP 02 · MEASURE & QUOTE

You get a 12-page PDF before we cut a single piece of metal.

Bore roundness, rod straightness, gland clearances, deck flatness, seat depths — captured against OEM tolerances, with a recommendation for each finding. If you’d rather replace than rebuild, we’ll tell you, and quote the replacement too.

12-page PDFDimensional dataPhoto evidenceCost vs replaceLead-time options
LONG READS · ENGINEERS WRITING ABOUT THEIR JOBS

Two recent service stories worth your time.

FROM THE FIELD · IWCF TRAINING · 5 D ON BENCH

IWCF and IADC WellSharp well-control certification — the cards Aramco asks for, taught by people who have closed a real BOP under a real kick.

IWCF and IADC WellSharp accredited well-control certification from the Dubai training centre. Drilling Well Control Levels 2-4, WIPC tracks (CT / Snubbing / Wireline), 2-year recerts. Monthly open enrolment plus 15+ candidate bulk cohorts at the centre or on-rig anywhere in the GCC. Bilingual EN / AR on request.

IWCF + IADC WellSharp accredited
Outcome
Aramco-spec supervisor cert
Outcome
Bilingual EN / AR on request
Outcome
SERVICE INTAKE · OPEN 24×7 · JEBEL ALI

If it leaks, hums, screams, drips, slips or simply refuses to move — we’d like a look at it.

Send us a photo, an SKU or a part on a pallet. We’ll do the rest.

An applications engineer will read your ticket inside one business day — no charge for the conversation, no obligation to use us.